H2 Interconnector
German-Danish cooperation project aims to realize 140-kilometer pipeline connection from Bornholm to Lubmin
The planned H2 Interconnector Bornholm-Lubmin is to bring hydrogen from the Danish island of Bornholm to Lubmin from 2027. This cross-border hydrogen infrastructure is expected to drive the development of offshore wind energy in the region and throughout the Baltic Sea. It also identifies a reliable and cost-effective decarbonisation path for the North-East European energy system.
The project, a planned 140-kilometer offshore pipeline is being developed by GASCADE together with Copenhagen Infrastructure Partners as a potential financial investor. The Danish transmission system operator Energinet is also involved in the project. The offshore line, for which a feasibility study has already been carried out with positive results, is intended to connect the island of Bornholm and the surrounding offshore wind farms with the German Baltic Sea coast near Lubmin. There, the hydrogen is fed into the onshore infrastructure and transported further south. The pipeline is expected to go into operation in 2027 and be able to provide capacity of up to 10 GW when completed in the 2030s.
Want to learn more, contact a member of the team today
